On site installation requirements
Global considerations
The Flowbox :
- must be installed on private networks (ie after the official flowmeter and tap of your local water authority/company),
- must be installed indoor,
- must have a power supply and network access (WiFi or Ethernet) to work,
- must be installed on a water network which prevents the hammer effect,
- must be installed on a water network with clean water (no waste water, no chemical products, etc.),
- must be installed on hot or cold water networks,
- must be installed horizontally or vertically,
- must NOT be installed on a heating water network or hydraulic fire system,
- should be installed in a place where it can be easily accessible for maintenance.
For all installation considerations, please refer to the notice.